Mill Notes

Items Required Before the Mill Can Run

VFD needs wired up (Sean)
  • Wire motor to the VFD
  • Find out what gauge wire is desired for the grounding wire.
  • Run the motor's ground to the grounding terminal.
  • Flip the switch and watch the mill explode
  • If no explosion, mount the VFD somewhere on the mill
Determine what all the piles of parts and gears are, and if any are actually needed for primary operation
  • Any power feed parts can be stored for later.

VFD Programing

Item Label Initial Value Desired Value
F1 Acceleration Time 2.0 ?
F2 Deceleration Time 2.0 ?
F3 Operation Mode 0 1 (run/stop, fwd/rev)
F4 Motor Rotation Direction 0 ?
F5 V/F Pattern 4 ?
F6 Frequency Upper Limit 60.5 120
F7 Frequency Lower Limit 59.5 50
F8 SP1 Frequency 10.0 ?
F9 Jog Frequency 6.0 ?
F10 Start/Stop Control 1 1 (Terminal control)
F11 Frequency Control 0 1 ( 0-20ma pot)
F12 Carrier Frequency Control 5 ?
F13 Torque Compensation 0.0 ?
F14 Stop Method 0 0
F15 DC Braking Time 0.5 ?
F16 DC Braking Injection Frequency 1.5 ?
F17 DC Braking Level 8.0 ?
F18 Electronic Thermal Overload 100 ?
F19 Multi-Function Input Connection 1 2 2
F20 Multi-Function Input Connection 2 5 5
F21 Multi-Function Output 3 ?
F22 Reverse Lock-Out 0 0 (enable rev)
F23 Momentary Power Loss 0 ?
F24 Auto-Restart Count 0 ?
F25 Factory reset (RO) 0 ?
F26 SP2 Freq 20.0 ?
F27 SP3 Freq 30.0 ?
F28 Direct Start 0 ?
F29 CPU Version (RO) 2.3  
F30 Fault log (RO) L.VC  

Items Required Before the Mill Runs Usefully

VFD front panel items
  • Consider a braking resistor to improve start/stop/etc times.
  • Obtain 10k ohm potentiometer for speed control, wire it up to +10v/vi/0v/FM" lines per p17 and p19.
  • Determine what the "Trip Relay" thing is about.
  • Why would I bother with the external +24V panel on p18?
Examine DRO (digital readout) setup
  • Determine what expense would be involved in adding DRO to Y and Z axes.
  • Mount DRO to the mill somewhere.
Big aluminum toolplate needs attached
  • Determine correct diameter for screws
  • Acquire correct pieces to connect toolplate to the mill.
Set up mill for operation
  • Set up appropriate storage for clamping kits, etc.
  • Acquire 3d taster for calibration as appropriate

Project Specific Issues

AK Builds

Barrel Setup
  • Determine correct means of clamping barrels.
  • Determine correct diameter and tool to drill gas ports.
  • Acquire appropriate end mills / drills for the tiny pin holes needed.
Parts Kit Demil
  • Consider building jig to allow end mills to be used in demilling parts kits. Supposed to be really, really fast.
Fitting barrel to trunion may well require the lathe to be operational.

AR Builds

Barrel setup
  • Determine correct means of clamping a variety of barrels.
  • Acquire taper reamer, for traditional front sight blocks?
  • Determine correct diameter and tool to drill gas ports.
  • Determine correct diameter and tool to drill barrel pin.
Receiver setup
  • Determine if I do in fact have a complete working jig setup.

Rudius 1911 Builds

Completely blocked on lack of grips from Ares.

Sten Builds

Worry about these after getting the lathe working.
Edit | Attach | Watch | Print version | History: r6 < r5 < r4 < r3 < r2 | Backlinks | Raw View | Raw edit | More topic actions
Topic revision: r6 - 2014-02-18 - SeanNewton
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2023 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback